Welcome to the Vertiv and MicroLink working document. Lets enjoy building something important.

50 kW outdoor IP55 cabinet, 1,600 by 1,200 by 2,000 mm. Direct liquid cooled, heat recovered to the building loop, dry cooler fallback on the roof.

2 MW factory built, two 45 ft HC containers. IT row in one, power and cooling in the other. Ships complete, lands on a slab, runs.

Block one is two 50 MW OneCore blocks, then the full 250 MW campus block. Four 250 MW blocks is the 1 GW programme.

Solution development and open design ideas. Host delivery loop, 800 V DC pilot, anything either side puts on the board.